Museum Chronology

1962

  • 1300 moved into Minnesota Transfer roundhouse, restoration begins
  • “Goat” power-supply-on-handcar built

1963

  • First operations at Minnesota Transfer May 11, 25
  • 11 operating days total 8919 rides
  • Operating site candidates studied: Minneapolis Anoka & Cuyuna Range, Como Park, across Como Avenue from State Fair, ADM elevator site near 29th & Elm SE

1965

  • Minnesota Transportation Museum (MTM) formally incorporated
  • Operating site candidates studied: Minnehaha Park, U of M Rosemount Research Station

1968

  • Steeple cab 20, crane and dump car acquired from Main Steam Station acquired

1969

  • Lake Harriet site proposed to Park Board
  • Park Board approves lease

1970

  • Como-Harriet Streetcar Line (CHSL) groundbreaking April 18
  • First track laid
  • Carbarn erected
  • Minnegazette newsletter started
  • Steeplecab 20 scrapped for parts

1971

  • 1300 moved to Lake Harriet
  • Rails laid carbarn to depot site
  • August 28 first public operation
  • ROW surveyed to Berry Road

1972

  • CHSL tokens minted
  • Uniforms set
  • Track laid to Berry bridge

1973

  • Overhead construction begins
  • Steel TCRT overhead poles recovered from 5th Ave. N.-5th Street wye
  • Big Island brochure printed
  • 78 and 265 acquired and moved to Como Shops
  • 1300 HO gauge model produced
  • CHSL power supply installed

1974

  • 265 restoration begins
  • Depot siding installed
  • Wildwood Park brochure reprinted

1975

  • 1300’s trucks to Shoreham for overhaul
  • Depot garden created
  • Northern extension planning begins

1976

  • Car 1496 South St. Paul “trolley church” purchased
  • Electric Railways of Minnesota published
  • Lake Calhoun extension begins
  • TCRT overhead wire truck purchased

1977

  • Lake Calhoun track extension completed
  • Depot garden dedicated

1978

  • Two Chicago L cars acquired for parts
  • Mesaba 10 acquired

1979

  • Western extension to Upton Avenue contemplated, but idea dropped
  • Shop building constructed
  • Metro Transit establishes bus stop for CFSL on Richfield Road

1980

  • 265 completed and moved to Lake Harriet
  • Body of streetcar 1508 stripped for parts
  • 1300 on cover of Minneapolis phone book
  • Steamboat Minnehaha salvaged from Lake Minnetonka

1981

  • Historic site plaque installed at 42nd Street
  • Minnegazette upgraded to magazine

1982

  • Como Shops vacated
  • Depot siding receives overhead wire; first 2-car operation
  • Belgian power truck for 78 acquired

1983

  • 78 restoration begins

1984

  • New 1300 stepwell
  • CHSL “Ready Barn” expansion starts

1985

  • Ready Barn completed

1986

  • Speeder ETS1 completed
  • Twin Cities Today brochure reprinted

1987

  • First portion of TCRT employee appointment cards acquired
  • Car 1239 acquired

1988

  • 1239 arrives at Jackson Street Roundhouse

1989

  • 265 leaf springs removed to soften ride

1990

  • Linden Hills depot opened
  • Member Conduct Code approved
  • CHSL security system installed
  • CHSL shop heaters installed
  • PCC cars 322 and 416 arrive from Cleveland
  • Steamboat Minnehaha acquired by MTM
  • Original TCRT steamboat plan, streetcar seats donated to Minnehaha restoration

1991

  • 78 in service
  • 322 moved into Metro Transit Overhaul Base for restoration
  • Steamboat Division acquires streetcar bodies 1809 and 1496

1992

  • 1809 cosmetic restoration begins

1993

  • Stove for 78 installed
  • Excelsior trolley exhibit track placed next to Historical Society
  • 1809 cosmetic restoration complete
  • Motorettes 50th Reunion at CHSL
  • 1 millionth passenger carried
  • CHSL wins Minneapolis Heritage Preservation Award
  • Russ Olson donates TCRT records to Minnesota Historical Society
  • Russ completes Electric Railways of Minnesota supplement

1994

  • Park Board approves CHSL carbarn expansion
  • Excelsior Streetcar Line (ESL) ISTEA grant approved
  • CHSL carbarn expansion ISTEA grant approved
  • Valley Fare gas trolleys acquired

1995

  • Twin City Lines-The 1940s published
  • New 1300 roof

1996

  • First MTM web site
  • Car 1809 moved near Minnehaha Dock
  • Steamboat Minnehaha maiden voyage
  • 600-photo Bob Schumacher collection donated
  • Photo/artifact database created

1997

  • CHSL carbarn expansion completed
  • ESL track construction begins and completed
  • 322 moves to Lake Harriet
  • Como-Harriet booklet with advertising printed
  • First CHSL Halloween Ghost Trolley
  • Zalusky all-time TCRT transfer collection donated
  • 43-photo Everett Jones collection donated
  • ISTEA grant approved for ESL Water Street loop

1998

  • Japanese streetcar trucks arrive
  • ESL carbarn completed
  • ESL starts service with ex-Valley Fair gas cars
  • Winona 10 discovered
  • Safety Zone sign acquired

1999

  • 265 renovation underway, receives Japanese trucks
  • 1239 moved from Jackson Street to ESL
  • Winona 10 acquired and moved to ESL
  • ESL overhead wire erected
  • 78 moved to ESL, starting ESL electric service
  • ESL Water Street loop plan abandoned
  • 200 ties replaced at CHSL
  • Interior bulkheads salvaged from Duluth car 195, making 1239 backdating possible

2000

  • ISTEA grant to rebuild CHSL track approved
  • 322 restoration completed
  • 265 back in service
  • First edition of Como-Harriet Currents newsletter

2001

  • 900-photo Gene Corbey collection donated
  • Minneapolis Historic Preservation Award for PCC 322 restoration
  • First season passes sold
  • “Change at Excelsior” poster created
  • Mesaba 10 moved from New Brighton Arsenal to ESL
  • Valley Fair gas cars sold to Iowa Trolley Park and Minnesota Zephyr

2002

  • Original TCRT bridge over ESL replaced
  • Como-Harriet book printed
  • 476-photo Art Rusterholz collection acquired

2003

  • Fargo-Moorhead Birney 28 acquired

2004

  • MTM Traction Division takes over ESL from Steamboat Division
  • Como-Harriet Currents renamed Streetcar Currents
  • 1239 restoration completed
  • Winona 10 restoration begins
  • $284,000 raised as local share of CHSL rebuild project
  • CHSL track rebuild completed, including restoration of pedestrian underpass and Cottage City stop
  • New wood platform for Linden Hills depot
  • First ESL Ghost Trolley

2005

  • Minnesota Streeetcar Museum (MSM) is spun off from Minnesota Transportation Museum (MTM)
  • Minnegazette becomes joint MSM/MTM history-only publication

2006

  • History signs installed along CHSL
  • 1300 exterior wainscoting replaced
  • 1239’s broken wheel replaced
  • MSM hosts Association of Railway Museums (ARM) Spring Conference
  • Como-Harriet Streetcar Line poster created by Rick Schuster
  • MSM online store opens
  • Pedestrian underpass lamp posts installed
  • Hopkins Historical Society, Charles Camitsch, Gordon Bassett, North Dakota State University photos acquired
  • TCRT valuation reports acquired
  • Wednesday afternoon shift started
  • ESL carbarn sprinkler system installed
  • First CHSL Holly Trolley

2007

  • George K  Isaacs Carbarn dedicated
  • MSM stops Minnegazette, starts Twin City Lines magazine
  • Twin Cities by Trolley published
  • Front end repairs to 1300
  • First MSM photos on Minnesota Reflections (Minnesota Digital Library)
  • The rest of the TCRT employee appointment cards donated by Metro Transit
  • 61 Harold Dalland and 89 Norm Podas photos acquired
  • First MSM photos posted on Minnesota Digital Library
  • First Christkindlsmarkt

2008

  • 500 David Carlson Duluth negatives and 78 Barney Olsen photos acquired
  • First ESL carbarn history displays
  • First Pumpkin Patch
  • TCRT overhead wire truck relocated to Richfield Bus Co
  • First Operations Newsletter

2009

  • TCRT 1909 system map poster printed
  • PJ Party started
  • CHSL power supply upgraded
  • CHSL carbarn sprinklers installed with security system upgrade
  • 62 John Stern photos acquired
  • Jim Kreuzberger’s Duluth streetcar notes donated

2010

  • Frank Sandberg donates over 200 TCRT shop drawings
  • ESL starts Storytime Trolley
  • TCRT Employee Appointment cards donated to Minnesota Historical Society
  • Mesaba 16 stripped for parts, then scrapped
  • Surplus traction motors sold to Edmonton Radial Railway Society
  • First Streetcar Camp
  • 42nd Street grade crossing rebuilt
  • Brick apron laid in front of Isaacs Carbarn
  • Dupont truck for Winona 10 arrives
  • Replacement windows shades made for 1300
  • Bridgeport milling machine acquired
  • Photo collection receives archival sleeves

2011

  • Linden Hills depot platform replaced and interior refurbished
  • Cottage City stop walkway completed
  • Jim Kreuzberger collection of books, models, 550 photos and records donated
  • PCC 322 model produced
  • First Murder Mystery at CHSL

2012

  • First streetcar movies digitized
  • Isaacs carbarn electrical upgraded
  • Linden Hills depot benches replaced
  • 276-photo Norman Rolfe collection purchased
  • First ESL North Pole Trolley

2013

  • CHSL restroom installed
  • All car cards scanned and stored; copies placed in streetcars
  • Isaacs Carbarn expansion project starts
  • ESL installs display in Excelsior visitor center

2014

  • New Point of Sale system for Linden Hills depot takes credit cards
  • 73 photos from Greer Nielsen collection and Duluth Incline movie acquired
  • Video screen in Linden Hills depot
  • Twin Ports by Trolley published
  • First streetcar musical performed
  • ShiftPlanning created for crew assignments
  • New window shades for 265 and 1239
  • 100+ photos from UMD and Douglas County Historical Society acquired
  • First Vinternatt

2015

  • Isaacs carbarn expansion (library, machine shop, speeder shed) completed
  • 265 renovation complete
  • Fence erected along Queen Avenue by Linden Hills depot
  • Granite paver crosswalk installed at ESL Water Street stop
  • Website makeover
  • Position of Volunteer Coordinator established
  • Duluth Street Railway records donated to UMD

2016

  • 265 receives 12-volt converter to charge battery, LED ditch lights, start-stop control safety sensors
  • Russ Olson donates his research papers
  • Russell L. Olson Library dedicated
  • Selby Tunnel history sign installed above the tunnel
  • Linden Hills depot repainted, new roof and rotted wood replaced
  • New air compressor for shop donated
  • 1300’s truck rebuild begins

2017

  • MSM hosts HeritageRail Alliance Fall conference
  • Streetcar history seminars posted on YouTube
  • ESL carbarn receives concrete floor
  • ESL carbarn electrical service upgraded
  • Speeder shed track installed
  • Isaacs carbarn brick apron relaid
  • Winona 10 first revenue trips
  • Twin Cities Streetcars in Color published

2018

  • 1300 truck overhaul completed
  • Fiber internet service installed at CHSL
  • Anti-graffiti fencing on east side of Isaacs carbarn
  • Major makeover of ESL carbarn store and display area
  • Winona 10 dedication
  • All Minnegazettes digitized
  • Lakewood Cemetary platform constructed
  • Car swap: 265 to ESL, 1239 to CHSL
  • Weekly Facebook history posts begin

2019

  • New trucks for 1239 project begins
  • New point of sale (POS) system
  • 1300’s lights rewired
  • New basement steps at Linden Hills depot
  • All 3-dimentional artifacts in the Olson Library catalogued
  • Fargo-Moorhead 28 moved from Ken Albrecht’s farm
  • Baker heater for 1239 delivered
  • All-Motorette crews at ESL and CHSL
  • 1300 and Winona 10 motor failures

2020

  • ESL overhead wire realignment
  • Covid shuts down all streetcar operations, CHSL shop closed until June, ESL shop closed all year
  • 1239 rewired and backdating to 1921 begins
  • Book scanner installed in Olson Library
  • 1950s Como-Harriet video completed and on YouTube
  • Facebook presence expands to at least 3 posts per week
  • Kids Clubs organized, with attendant newsletters and videos
  • Electrical control panels in Isaacs carbarn upgraded
  • 200 ties replaced at CHSL
  • ESL carbarn gets anti-graffiti fencing
  • 2 millionth passenger carried

2021

  • CHSL overhead wire realignment and pole replacement
  • Car 78 controllers rebuilt
  • Streetcar history signs installed along 44th Street right of way
  • 1239 backdated to 1921, including Baker heater installation
  • History Powerpoint series posted on YouTube
  • Jib crane installed in Isaacs carbarn machine shop
  • Video security cameras installed at Isaacs carbarn
  • Post-Covid streetcar operations start July 2
  • 50th Anniversary of CHSL August 28